As part of ongoing upgrades to Melbourne Water’s Western Treatment Plant, BMD Constructions are building a new 150 ML/d Nutrient Removal Plant (NRP) that will replace the existing 55E Activated Sludge Plant.

The project involves constructing five NRP clarifier tanks, interconnecting pipe works, blower and service buildings, and several pump stations. However, before the construction works could take place, it was necessary to engage NPE to provide a dewatering system. NPE rose to the challenge and designed and installed a horizontal dewatering system that included 13 piston pumps. Since its installation, the system has been operating smoothly with no failures.

Although there were some initial issues with the system, including air influx, these were resolved by trimming the pumps and installing air relief valves. Overall, the dewatering system has succeeded greatly, maintaining a steady groundwater level with no breakdowns.

High-Performance Pumping Solutions for Extreme Weather Events- QLD

Quarry pit dewatering is essential for maintaining safe and productive operations by removing accumulated rainwater and groundwater to prevent flooding…

Assisted Water Reduction Using Evaporation Fans in Queensland

Our client required a 24-unit evaporator fan package at Cannington Mine to lower water levels within the Tailings Storage Facility…

 NPE Bypass Solutions for  Black Rock Water Reclamation Plant

 National Pump & Energy (NPE) was engaged by AMH Civil to deliver a full bypass solution for the Black Rock…

Wet Season Management in North-West Queensland Mining​

NPE was engaged to support a remote north-west Queensland operation following significant rainfall, with approximately 370 mm recorded over a…

Royal Far West Manly Dewatering

NPE was awarded a dewatering and water treatment project to facilitate construction activities. To manage this project effectively, the temporary…

PFAS Treatment Perth, WA

The treatment process begins with a dewatering system that extracts groundwater for processing. The influent is conveyed through the plant,…

Critical Sewer Bypass Solution with Dual Diesel Pump System

National Pump & Energy (NPE) was engaged to support a critical infrastructure project with a temporary sewer bypass solution. The…