Wellpoint Dewatering – SA
Wellpoint Dewatering System for a stormwater upgrade Old Port Road Adelaide, South Australia.Old Port Road is a major arterial road connecting Adelaide and Port Adelaide. Old Port Road was one…
Read MoreWellpoint Dewatering – WA
NPE were engaged by our client regarding installing an LLDPE 11000 litre tank. The depth to the static groundwater level was 1.5m below surface ground level, and the concrete footing…
Read MoreStudent Accommodation Development – NSW
Student Accommodation Development Dewatering was required to allow for the construction of student accommodation with a 2-level basement car park. Bulk excavation level approx. 5m BEGL with localised pits going…
Read MoreChallenging Dewatering on Contaminated Grounds – Balcatta WA
We were engaged by BOS Civil, which required prompt dewatering in troublesome ground conditions throughout their 2 x extensive basin excavation works in Balcatta, WA. The following morning, NPE mobilised all…
Read MoreHydromining Process Water Pond – Pilbara WA
Over time, water ponds that are gravity fed become full of tailings, which reduce their storage and surge capacity. These ponds require tailings to be removed periodically; however, excavation methods…
Read MoreEmptying and Cleaning the Digester – Boliver SA
Digester emptying and cleaning works were carried out utilising NPE’s purpose-built pumping/mixing equipment suspended from a 60t crane. The pump is a heavy-duty, hydraulically powered unit specifically modified by NPE…