PROJECT SPOTLIGHTS
Challenging Dewatering on Contaminated Grounds – Balcatta WA
We were engaged by BOS Civil, which required prompt dewatering in troublesome ground conditions throughout their 2 x extensive basin excavation works in Balcatta, WA. The following morning, NPE mobilised all plant…
Read MoreHydromining Process Water Pond – Pilbara WA
Over time, water ponds that are gravity fed become full of tailings, which reduce their storage and surge capacity. These ponds require tailings to be removed periodically; however, excavation methods…
Read MoreEmptying and Cleaning the Digester – Boliver SA
Digester emptying and cleaning works were carried out utilising NPE’s purpose-built pumping/mixing equipment suspended from a 60t crane. The pump is a heavy-duty, hydraulically powered unit specifically modified by NPE…
Read MoreBelconnen Trunk Sewer Augmentation – ACT
NPE were engaged to perform a critical bypass required in order for our client to complete the final stage of a major project building additional capacity and redundancy into the…
Read MorePump Station Bypass – Queensland
A local water authority recently asked NPE to provide a bypass for a pump station, the pump station needed to be taken offline to complete works. The bypass needed to…
Read MoreGlen Huntly Level Crossing Works, VIC
NPE worked closely with the SPA team to execute the installation and development of dewatering wells for Glen Huntly Level Crossing works, under both occupation and train running environments. The…
Read More