NSW TCM Bypass


NPE was engaged in providing a temporary works proposal that details the operating strategy and management of the sewer bypass works for the HB01 Wastewater pump station in Killcare.
NPE utilised the latest telemetry options and control functions and supplied online logins to the client. 3 x electric submersibles located within the collection manhole that feed into three separate booster pumps to achieve 57L/s per pump arrangement. Diesel backup generator supplied with an automatic switch to enable seamless cutover in the event of power failure. The client successfully completed their work in 4-week duration.