Dewatering & Water Treatment at Perth Busport Project, WA

NPE were involved in this project for the drilling and installation of a series of pumping wells within the excavation and recharge wells outside the excavation to create an efficient dewatering system that depressurised the aquifers and lowered and maintained the groundwater table by eight (8) metres next to the existing underground tunnel. The biggest challenge of the project was to ensure dewatering extraction did not cause any settlement to the neighbouring infrastructures.

Extracted groundwater was recharged into the aquifers via recharge wells outside the excavation zone. The dewatering system was designed to recharge at 35 litres per second at a suitable operating pressure.

Water was treated via a new and improved customised water treatment system designed to perform inline adjustments to water quality by correcting pH levels and removing iron and other harmful heavy metals before being recharged and discharged into the environment. The project saw progress in technology innovation and improvements in environmental aspects by introducing a custom-built sludge press as the key to sludge management.

High-Performance Pumping Solutions for Extreme Weather Events- QLD

Quarry pit dewatering is essential for maintaining safe and productive operations by removing accumulated rainwater and groundwater to prevent flooding…

Assisted Water Reduction Using Evaporation Fans in Queensland

Our client required a 24-unit evaporator fan package at Cannington Mine to lower water levels within the Tailings Storage Facility…

 NPE Bypass Solutions for  Black Rock Water Reclamation Plant

 National Pump & Energy (NPE) was engaged by AMH Civil to deliver a full bypass solution for the Black Rock…

Wet Season Management in North-West Queensland Mining​

NPE was engaged to support a remote north-west Queensland operation following significant rainfall, with approximately 370 mm recorded over a…

Royal Far West Manly Dewatering

NPE was awarded a dewatering and water treatment project to facilitate construction activities. To manage this project effectively, the temporary…

PFAS Treatment Perth, WA

The treatment process begins with a dewatering system that extracts groundwater for processing. The influent is conveyed through the plant,…

Critical Sewer Bypass Solution with Dual Diesel Pump System

National Pump & Energy (NPE) was engaged to support a critical infrastructure project with a temporary sewer bypass solution. The…