Wellpoint Dewatering – SA

Wellpoint Dewatering System for a stormwater upgrade Old Port Road Adelaide, South Australia. Old Port Road is a major arterial road connecting Adelaide and Port Adelaide. Old Port Road was one of the first roads established in the new colony of South Australia. NPE has installed a 60m Wellpoint Dewatering System to lower groundwater below…

Read More

Wellpoint Dewatering – WA

NPE were engaged by our client regarding installing an LLDPE 11000 litre tank. The depth to the static groundwater level was 1.5m below surface ground level, and the concrete footing for their tank base needed to be dry down to 2.6m invert from GL (ground level). NPE mobilised to the site and installed a Wellpoint…

Read More

Student Accommodation Development – NSW

Student Accommodation Development Dewatering was required to allow for the construction of student accommodation with a 2-level basement car park. Bulk excavation level approx. 5m BEGL with localised pits going further 1.5m deep to 6.5m BEGL. Installation of 240m perimeter dewatering system along with localised pit dewatering. Treatment to ANZEC 95% Freshwater guidelines. The Chemical…

Read More

Challenging Dewatering on Contaminated Grounds – Balcatta WA

We were engaged by BOS Civil, which required prompt dewatering in troublesome ground conditions throughout their 2 x extensive basin excavation works in Balcatta, WA.  The following morning, NPE mobilised all plant and technician specialists to start the wellpoint installation. The ground’s existing building materials, including rubble, bricks, steel, car diffs, and other obstructions, became apparent…

Read More

Hydromining Process Water Pond – Pilbara WA

Over time, water ponds that are gravity fed become full of tailings, which reduce their storage and surge capacity. These ponds require tailings to be removed periodically; however, excavation methods can present some risks of liner damage. Hydromining is the perfect solution. It agitates the solids (tailing build-up), pumping it back to the tailings dam.…

Read More

Emptying and Cleaning the Digester – Boliver SA

Digester emptying and cleaning works were carried out utilising NPE’s purpose-built pumping/mixing equipment suspended from a 60t crane. The pump is a heavy-duty, hydraulically powered unit specifically modified by NPE for these applications. The digester contents were pumped out via an NPE installed discharge line, which was connected to an adjacently installed existing pipeline that…

Read More

Belconnen Trunk Sewer Augmentation – ACT

NPE were engaged to perform a critical bypass required in order for our client to complete the final stage of a major project building additional capacity and redundancy into the local water authorities wastewater network. NPE’s role was to install, commission and manage the sewer via a pumped overland bypass in order to provide a…

Read More

Pump Station Bypass – Queensland

A local water authority recently asked NPE to provide a bypass for a pump station, the pump station needed to be taken offline to complete works. The bypass needed to be capable of 75L/S, this was diverting flow from a DN900 line. NPE mobilised the necessary pumps & pipework (200m) in a prompt manner delivering…

Read More

Glen Huntly Level Crossing Works, VIC

NPE worked closely with the SPA team to execute the installation and development of dewatering wells for Glen Huntly Level Crossing works, under both occupation and train running environments. The client required the hire and installation of pumps, sediment tanks / water treatment and local pipe routes to manage the pumping of groundwater out of…

Read More

Old Murray Bridge Refurbishment – SA

Due to the recent Murray River flooding, NPE was tasked with supplying a pump set up to move 800,000,000 litres behind a levee bank as soon as possible so that the client could continue with their main works for the Old Murray Bridge Refurbishment Project. NPE quickly mobilised the pump and 700m of hose to…

Read More