Posts by Alex Boynes
Bypass Pumping, Penrith NSW
NPE Supplying Penrith with a Wastewater Bypass System to Facilitate Pump Station Upgrades Installing a wastewater bypass system in Penrith marks a significant milestone in upgradingthe main pump station. NPE, a leading provider of wastewater solutions, has successfully supplied and installed the system, ensuring minimal disruption to essential services during the upgrade process. The wastewater…
Read MoreSewage Bypass Management Project Tuross, NSW
NPE Temporary Sewage Bypass Management Project Underway in Tuross, NSW NPE is pleased to announce that it has been engaged by IronBuilt Infrastructure to commence the temporary sewage bypass management and construction project in Tuross, NSW. The project aims to facilitate the upgrade of the existing infrastructure by the Civil team. NPE has diligently developed…
Read MoreWell Point Dewatering, Perth WA
NPE were engaged by Alita Constructions to install dewatering at 2 different locations at their project located on Dowd St, Welshpool. The purpose of the install was to allow the client to excavate below the water table to complete the final connection of the site stormwater system and install a large aerobic treatment unit. We…
Read MoreTank Flush, Esperance WA
NPE were engaged by Carey MC to provide Dewatering and Environmental Management for the Berth 2 hardstand renewal, construction of flush tanks and installation of a dissolved metal treatment filter system at Southern Ports’ Port of Esperance. NPE began with the development of the Dewatering Management Plan to align with the conditions required by the…
Read MoreOutback Splash Dewatering – WA
NPE delivers successful dewatering solution for Perth’s Outback Splash Lagoon Pool construction Perth’s Outback Splash is set to unveil a stunning new Lagoon Pool, and NPE is proud to have played a crucial role in making it happen. NPE was engaged via Funday Entertainment Group for the construction of the new pool, and our team…
Read MoreDigester Clean Wastewater Treatment Plant, Boliver SA
The process of emptying and cleaning the digester involved using specialised pumping equipment provided by NPE. This was suspended from a 60-ton crane for efficient operation and flexibility of movement. The pump used for this task was a heavy-duty hydraulic unit specifically adapted by NPE to handle these projects. To remove the contents of the…
Read MoreHydromining, WA
A client had requested NPE’s assistance in cleaning out one of their process water dams which was full of slurry/mud, thus reducing the storage capacity for valuable water. NPE provided a complete Hydromining Package and four of its skilled technicians to carry out the work. The technicians were able to complete the installation, commissioning, operation,…
Read MoreBurwood Beach Wastewater Treatment Plant Bypass, NSW
Recently, NPE were engaged by regional water authorities to supply and install a 20” diesel bypass pump from a collection pit to the ABF tower to begin a flushing program on the ABF tower. The client required 450mm polyline and flows up to 450l/s at 24m rise. The discharge location was located at the ABF…
Read MoreOpen Pit Dewatering, Southern Cross WA
This project involves installing and commissioning a leak detection system designed by NPE for a client located in Southern Cross, WA. The system is installed in Fraser Pit, located on the town’s outskirts. NPE has engineered and installed the system and is responsible for selling the leak detection system to the client. The system is…
Read MorePontoon Open Pit Dewatering Packages Stage 1 – WA
Pontoon Open Pit Dewatering Packages Stage 1, WA The Woodie Woodie mine site is ConsMin‘s key asset and is located approximately 400km south-east of Port Hedland. The operation consists of open-pit mining across several pits and a 1.6Mtpa processing plant. The tenement consists of 1,290km2 of exploration tenements and 100km2 in the mining corridor. Manganese ore…
Read More